PRESIDIO
Open a workbook to enable editing. Auto-save is enabled.
v9.1

Change notes

  • v9.1: Added Microsoft Entra ID SSO with MSAL, delegated Microsoft Graph access, cloud workbook loading, and direct Excel range updates.
  • v9.0: Promoted the custom slide builder, workbook visibility controls, and Excel-safe image configuration export to the v9.0 release.
  • v8.7.1: Fixed Excel configuration export for embedded images by splitting image data into Excel-safe chunks on a separate Custom_Slide_Images worksheet.
  • v8.7: Added workbook-driven custom slides, workbook Enabled toggle, custom slide builder, browser draft storage, and Excel configuration export.
  • v8.6.2: Project Metrics & Overview now uses only Active, Paused, and Closed project icons. Paused and Closed rows receive subtle status shading and a matching left accent.
  • v8.6.1: Baseline Date, Planned Date, and Date Closed now display recognized dates as mm/dd/yyyy while preserving non-date text such as NA, TBD, Pending, or Week of 8/31.
  • v8.6: Restored the official VMware logo from the provided vmWareLogo.png asset.
  • v8.4: Updated the Excel icon with an upload arrow and updated the PDF icon to display PDF lettering.
  • v8.3: Removed the manual Save Workbook button; workbook edits continue to use the existing automatic save workflow.
  • v8.3: Replaced the Open Workbook and Export PDF text buttons with compact Excel and PDF icons.
  • v8.2: Corrected the workbook XML cell-type replacement that could create duplicate type attributes and cause Excel to repair or reject the saved workbook.
  • v8.2: Added package validation before the original workbook can be overwritten.
  • v8.1: Restored the original report styling. Editable values display normally and open an inline editor only when clicked.
  • v8.1: Workbook saves now patch only changed cell XML inside the original file package, preserving workbook formatting, formulas, validations, merges, and other workbook content.
  • v8.0: Project Status and RAID slides are editable and auto-save to the opened workbook.
  • v8.0: Pick-list fields use workbook-aligned options; calculated fields and Challenges/Decisions remain read-only.
  • v7.7: Project Timeline replaced with a Smartsheet-style Roadmap/Gantt view.
  • Roadmap now uses milestone status normalization aligned with the Artifact/Objectives Status column.
  • Roadmap KPI and legend updated to use Canceled milestones instead of At Risk.
  • Program report table widths tuned to prioritize Notes.
  • VMware logo restored in bottom-left footer.
  • Client status parsing corrected.
  • Project PDFs use the email subject as filename.
  • Project view uses a Share menu for Gmail/Outlook.
  • Gmail option downloads PDF and copies compose URL.
  • Program Reports now include a dynamic VCF Entitlement Pipeline slide sourced from the Jira Pipeline sheet.
  • Pipeline slide redesigned with modern KPI cards, status-driven colors, and opportunity cards.
  • Program dashboard RAG/status cells now render as theme-matched status circles.
  • Project report cover slide restyled to better match the original green Broadcom/VMware deck layout.
  • Program dashboard status cells restored to colored RAG blocks; Overall now displays normalized R/Y/G values.
  • Project report cover artwork simplified to two SVG paths: one main gradient fill and one clean green accent curve/line.
  • Email exports now use the selected project sheet for TO greeting and Project Manager signoff.
  • Project metadata parsing now avoids Communications Contacts rows so cover slides show the correct Project Manager.
  • Report date picker added; Program and Project cover dates, email subject lines, PDF output, and Project PDF filenames now use the selected local report date.
  • Email greetings now use the selected project sheet TO contact, prefer Client TO when available, and address only the recipient first name.
  • Project picker now keys selections by source worksheet so email exports use the correct project sheet contacts.
  • Email debug logging added to show selected project identity and parsed contacts during Gmail/Outlook export.
  • Contact parsing now continues through each project worksheet contact table so later Client TO rows, such as Eastman Phil Preast, are included.
  • Program Reports now separate dashboard narrative content from project metrics/overview table on a dedicated slide, with Risks added from Program_Dashboard.
  • Project Timeline page replaced with a Smartsheet-style Project Roadmap/Gantt view using Artifact/Objectives baseline and planned dates.
  • Roadmap metrics and legend now replace At Risk with Canceled, including a canceled milestone icon.
  • Roadmap status normalization fixed so Not Started values no longer classify as In Progress.